Every workload resolves to one of six patterns. The pattern determines how many model calls a single user request actually makes, how much context is re-sent between agents, and how much reasoning is generated but never shown.
That is what token amplification measures. It has two parts, because they behave differently: input amplification covers context re-sent to every agent in a fan-out, and output amplification covers planning, verification and hidden chain-of-thought.
The factors below are calibrated estimates, not measured traces. The ordering is defensible; the values are not validated.
If you have measured token traces, replace them. Every use case, cost and fleet figure downstream recalculates from these numbers.
—
All fields editable · Click "Estimate tokens" to auto-calculate input & output tokens| Use Case | Agentic Interactions /Day ? |
Avg Input Tokens /Interaction ? |
Avg Output Tokens /Interaction ? |
Architecture Archetype ? |
Token Amplification Factor ? |
Est. Total Tokens /Day ? |
|---|---|---|---|---|---|---|
| TOTAL (ALL USE CASES) | — | — | — | |||
—
| In | Use Case | Agent Action |
Data & Context |
Workflow Hops |
Thinking Depth |
Output Volume |
Est. Total Tokens/Day |
Overall Token Intensity |
|---|
Derived from total tokens/day: Low <10M · Medium 10M–100M · High >100M
Composite of four signals detected per use case: regulated data, PII / customer data, real-time latency dependency, and proprietary IP exposure.
Both axes can be set per use case in the Demand and Control columns of the heat map above. The small dot under a letter marks the value the tool auto-detected. Bubbles you have moved manually carry a dashed outline.
Input Token Cost
Output Token Cost
The default comparison uses published list prices — the same rates a startup pays for their first API call. Enterprises operating at the token volumes that justify a $480K–$2M GPU cluster have invariably negotiated committed-use discounts. At 50% off list price, a scenario that shows on-prem saving $1.2M over 3 years often inverts to cloud being $800K cheaper. Always obtain your cloud account team's enterprise rate before drawing a final conclusion.
(Tokens + Infra)
(Tokens + Infra)
Investment Horizon
Most TCO analyses assume the on-prem system handles 100% of workloads from day one. In practice: hardware procurement takes 3–6 months, installation and security certification add another 2–4 months, and Year 1 utilisation rarely exceeds 30–40% as use cases onboard. A scenario that looks like breakeven at month 18 often realistically breaks even at month 28–34 — sometimes beyond a 3-year window entirely, which can reverse the recommendation.
The chart on the next page shows the adjusted breakeven curve accounting for your ramp-up period and Year 1 utilisation. The shaded zone marks the ramp period where both cost streams run simultaneously with no on-prem production.